Date: 21/11/2025Customer: Anglian WaterSite: Tilbury OverviewOur engineer completed the installation of a new control panel and associated cabling at the Anglian Water site in [...]
Case Study: V-Belt Break Detection via VSD
Raphael2025-11-06T09:15:23+00:00When Anglian Water contacted Gibbons Engineering Group regarding their aeration blowers at Hadleigh Works near Ipswich, they had a specific challenge in mind. They [...]
Case Study: VSD Upgrade and Rewiring
Raphael2025-10-24T14:05:54+01:00Customer: Anglian WaterSite details/Job: Botesdale temporary aerator 7.5kW VSD installDate: 13/10/25 Project Overview:The project involved upgrading an existing Variable Speed Drive (VSD) system to [...]
VSD Panel Installation at Rayleigh East
Raphael2025-09-08T11:04:24+01:00Customer: Anglian Water Location: Rayleigh Date: 9th May 2025 At Rayleigh East, Gibbons Engineering Group was tasked with installing a new Variable Speed Drive [...]
Case Study: VSD Retrofit for Anglian Water
Raphael2025-08-26T14:46:12+01:00Client: Anglian WaterProject: Combs Pump 2 – VSD RetrofitDate: 19/08/2025 A Gibbons Engineer carried out a retrofit at Anglian Water’s Combs site, replacing an [...]
iMod® Coil Cleaning with ROI
Raphael2025-08-18T10:14:05+01:00iMod® Coil Cleaning with ROI: Lower Static Pressure & Higher Efficiency GPS Air's iMod - a modular high-output ionizing system - helps clean deep-row [...]
Kiosk Replacement at AW North Ockendon
Raphael2025-08-12T09:09:07+01:00Client: Anglian Water Location: North Ockenden, Essex Project Overview At Anglian Water’s North Ockenden site, a roadside kiosk housing vital control equipment for a [...]
Case Study: VSD Installation for Drum Thickener at Wickford Site
Raphael2025-07-23T14:24:54+01:00Client: Anglian WaterLocation: Wickford, EssexDate: 18th July 2025Duration: 2 DaysPersonnel: 1 Engineer Project Overview Anglian Water required a VSD installation (Variable Speed Drive) to [...]
Case Study: Installation of Two New ABB ACS880 VSDs
Raphael2025-07-10T11:03:57+01:00Overview Gibbons Engineering Group was tasked with upgrading the existing motor control system for a client by replacing two Variable Speed Drives (VSDs) with [...]
Case Study: ACQ580 VSD Installation at Remote Pumping Station
Raphael2025-04-17T15:01:59+01:00Client: Anglian Water Location: Wivenhoe, Essex Date: April 2025 Project Type: VSD Upgrade & Control Panel Modifications Products Used: x3 18.5kW ABB ACQ580 Variable [...]
AHU Inspection at Historic Venue
Raphael2025-01-22T14:59:34+00:00Objective: To conduct AHU inspection (Air Handling Units) following a previous pre-commissioning visit. Background The AHUs in question had been inactive for nearly six [...]
Case Study: Maintenance and Repairs at a Supermarket HQ
Raphael2024-12-10T09:50:45+00:00Overview Gibbons Engineering Group was called upon to address multiple maintenance and repairs at a supermarket headquarters in London, UK. These included bearing replacements [...]
Upgrading to ABB Drives for Effluent Pump Control
Raphael2024-10-04T14:19:57+01:00Client: Anglia Water, Kings Lynn, Norfolk UK Industry: Water & Sewage Treatment Project: Replacement of Effluent Pump Drive System Partners: Gibbons Engineering Group, [...]
VSD replacement for water treatment works
Raphael2024-09-12T12:17:32+01:00Sprites Hall water treatment works At Sprites Hall Water Booster, Gibbons Engineering initially installed variable speed drives (VSDs) back in 2001. After 23 years [...]
Fan maintenance at a top UK University
Raphael2024-07-16T10:27:46+01:00Project Objective: The objective of this service visit was to perform comprehensive maintenance on three centrifugal fans located at the university. Site Visit Overview: [...]
Gibbons Engineers react quickly to flood-damaged control panels
Raphael2024-07-01T09:47:47+01:00Overview: A high-profile water supplier contacted the Gibbons support team with an urgent request for emergency engineers on-site, after discovering that a room containing [...]
Order! Order! HVAC System Upgrade at the Court Building
Raphael2025-11-11T12:08:25+00:00Project Overview The Gibbons HVAC team was tasked with upgrading and maintaining the HVAC system in a high-profile London court building, focusing on Air [...]
Children’s Hospital Benefits from Bipolar Ionization
Raphael2024-05-30T09:50:45+01:00Based on the results from this study, the hospital implemented GPS Air’s NPBI technology in all HVAC systems including patient rooms, operating rooms (OR), [...]
110kW Electric Motor replacement
Raphael2024-03-05T14:08:24+00:00Our engineers were called to a site in Witham, Essex to replace a 110kW electric motor for a blower that kills bacteria by aerating [...]
Electric motor upgrade for Anglian Water site
Raphael2024-02-09T11:15:23+00:00The Gibbons team was recently called to an Anglian Water site in Little Waltham to upgrade an old slip ring electric motor and starter [...]
Energy Optimisation at Colchester Garrison Swimming Pool
Raphael2024-01-05T14:42:42+00:00Project Overview: The Colchester Garrison, a prominent military installation, houses a range of facilities for soldiers' recreational activities, including a swimming pool. The management [...]
Major road tunnel fan maintenance
Raphael2023-12-05T10:58:02+00:00The brief Gibbons HVAC engineers recently completed the inspection of the main portal axial fans in a major UK road tunnel. The site visit [...]
No Time to Waste
Raphael2023-10-05T14:20:13+01:00There was no time to waste when the Gibbons team was recently dispatched to the Anglian Water Stambourne site to fine-tune and enhance the [...]
Noise issues, no problem
Raphael2023-08-17T10:40:55+01:00When a local farmer had noise issues with the huge aeration fans that keep his grain cool and dry, he decided it was time [...]
Temporary bore hole drive
Raphael2023-05-25T11:03:28+01:00The Gibbons electrical engineers were on hand at a Northumbrian Water site in Rickenhall to connect a Variable-Speed Drive to a pump that controls [...]
Colchester Zoo – Patagonia pump refurbishment
Raphael2023-04-14T15:16:17+01:00The Gibbons maintenance team was recently on hand at Colchester Zoo to remove a pump from the sea lion enclosure as it was due [...]
Retrofit at Ardleigh Treatment Works
Raphael2023-03-28T09:21:41+01:00Anglian Water is the largest water and water recycling company in England and Wales by area, providing drinking water to more than 4.2 million [...]
Out with the old, in with a new ABB ACH580
Raphael2022-12-05T10:14:10+00:00When the Hitachi Variable-Speed Drive failed on low-lift pump No.2 at a water treatment works, we knew exactly what to do. Three years ago, [...]
Workers feel the heat at a plastic processing plant
Raphael2022-11-09T12:29:16+00:00Situated in Maldon, Essex, Fiberweb Geosynthetics is a subsidiary of Berry Global, a global plastics manufacturer. The factory in Maldon produces a wide range [...]
Bank Gains Interest with Total Coil Disinfection System
Raphael2022-08-15T11:49:52+01:00A major central London bank was able to identify significant energy savings and enhance staff wellbeing thanks to a trial of Gibbons' Total Coil [...]
Emergency drive-hire team comes to the rescue
Raphael2022-07-29T12:24:16+01:00On a warm, bright Sunday morning, our emergency drives team received an urgent call from a local sugar processing plant. The Gibbons team sprang [...]
A Failed Centrifugal Fan almost causes disruption
Raphael2022-07-18T15:39:01+01:00At the end of another busy day, Gibbons received a call from our customer reporting a failed centrifugal fan bearing. The fan served an [...]
Gibbons’ Engineers are on hand to limit the downtime of an industrial mixer
Raphael2022-06-29T09:02:12+01:00When we took the call from a food processing company, Gibbons’ engineers were on hand to limit downtime. We knew we would have to [...]
Paint Shop Fan Breakdown Repair
Raphael2022-05-23T14:23:04+01:00When a market leader in paint shop design and manufacture experienced an untimely and frustrating paint shop fan breakdown during a crucial production run [...]
Driving a Drive to Ely Early
Raphael2021-05-11T12:50:55+01:00How one out of hours call about a Variable Speed Drive failure got resolved within half a day – and potentially avoided some serious [...]
Replacing Jet Fans At Lightning Speed
Claudia Taylor2021-11-10T16:03:38+00:00The Roundhill tunnels were opened in 1993, they link Roundhill and Palmer’s Hill in Kent on the A20. The tunnels took three years to [...]
Inverter installation for Water Provider
Raphael2020-10-08T10:05:18+01:00In September 2020, the Optimisation Team at Anglian Water tasked Gibbons Engineering Group to complete an inverter drive upgrade in Burnham-on-Crouch. The Anglian Water [...]
Emergency Motor Replacement for Water Provider
Raphael2020-08-19T11:12:28+01:00When a motor breakdown caused an important aerator at a Sewage Treatment Works to fail, we were on hand to supply an emergency motor [...]
Data Centre Humidification
Raphael2020-02-20T15:42:23+00:00The safe and secure storage of data is now of major importance and precisely maintaining conditions for the vast racks of electronics is a [...]
Gibbons’ Humidification System Commissioned Worldwide
Raphael2020-02-20T15:38:17+00:00Back in 2008, a global manufacturer of semiconductors commissioned Gibbons Humidification to convert its Scottish production facility from compressed-air spray-nozzle humidifiers to our rotary [...]
Swimming Pool Air Handling Unit Servicing
Raphael2020-03-02T15:42:18+00:00The Gibbons HVAC team fully serviced an AHU for a council run swimming pool in Suffolk. The works involved the main AHU providing supply [...]
Major Financial Institution Installs UVC
Raphael2020-02-20T08:32:12+00:00When a major international financial institution wanted to improve indoor air quality (IAQ) at its 250,000-square feet central London commercial offices in order to [...]
Hire Drives Keep Water Flowing for Anglian Water Customers
Raphael2020-03-02T15:43:18+00:00A pumping station is repaired within hours following a drive breakdown, avoiding 2,000 homes being left without water. Anglian Water avoided a serious interruption [...]
Food Manufacturer Adds ABB Drive to the Mix
Raphael2019-12-05T13:28:59+00:00ABB drive and control package helps Baxters Food Group to increase production capabilities at its Colchester site. Baxters Food Group is using an ABB [...]
Anglian Water Motor Replacement
Raphael2019-10-10T11:35:01+01:00The Problem: When a pump motor working at Anglian Water’s Long Sutton Sewage Treatment Works burnt out, it needed to be quickly replaced with a [...]
Lock, Stock and one Smoking Extractor Fan!
Raphael2019-09-19T14:28:54+01:00The Problem: A top London hotel – which has featured in some iconic British films such as Lock, Stock and Two Smoking Barrels – [...]
Condition Based Monitoring
Raphael2020-02-20T15:52:48+00:00Our effective condition monitoring service involves extensive assessment of equipment such as fans, electric motors and pumps, which enables us to help clients in [...]
Air Handling Unit Upgrade for the Network Building
Raphael2019-09-19T14:31:51+01:00The Problem: The Network Building, a seven-storey property located in the heart of London, needed its rooftop air handling unit serviced and upgraded. Due [...]
Swimming Pool Air Handling Unit Refurbishment
Raphael2019-09-19T14:32:39+01:00The Problem: A council-run leisure pool in Suffolk was faced with an inefficient, failing air handling system. The air handling units (AHUs) in question [...]
Air Handling Unit Installation on the 20th Floor
Raphael2019-09-19T11:51:28+01:00The Problem: Our client needed two large Air Handling Units, including thermal wheels, to be constructed within the dizzy heights of a 20th floor [...]
Barbican Centre Humidification System Refurbishment
Raphael2019-09-19T14:57:37+01:00The Problem: The Barbican on London’s Silk Street opened in 1982 and welcomes over 1.8 million visitors each year. The Grade II listed building [...]
Arla Foods Ventilation Improvements
Raphael2019-09-19T15:58:01+01:00The Problem: Arla Foods, one of the UK’s leading dairy companies, wished to improve ventilation at their facility, where they process approximately two billion [...]
Anglian Water Cuts £2,000 a Year
Raphael2019-09-20T11:47:02+01:00The Problem: A reservoir in Suffolk was being fed by two borehole pumps operated by Anglian Water. Both pumps were running at a fixed [...]
Cooling Coil Replacement Requires a Head for Heights
Raphael2019-09-20T08:24:31+01:00The Problem: The cooling coil of an air handling unit that was part of a HVAC system serving a new development on the Cambridge [...]
Cooling Tower Upgrade for Major Retailer
Raphael2019-09-20T11:04:41+01:00The Problem: The incumbent facilities company working on behalf of one of the UK’s largest grocery retailers asked our HVAC team to undertake an [...]
Gibbons HVAC Services on hand at London’s Canary Wharf
Raphael2019-09-20T11:37:07+01:00The Problem: A fire-damaged air handling unit that was serving a prestigious 14,000 sq. ft office building in London’s Canary Wharf needed to be [...]
Ultraviolet System Trialled at NHS Facility
Raphael2020-02-20T15:49:31+00:00Hospitals and healthcare facilities are among the most important places to have the very best levels of indoor air quality. As part of a continuous process of monitoring, [...]
Lilly Pharmaceuticals Save Energy with Gibbons
Raphael2020-02-18T16:07:51+00:00The Lilly building comprises a large office space designed around a full-height central atrium. The building was originally built to a high specification in [...]
Total Coil Disinfection Significantly Improves Energy Efficiency for Major UK Retailer
Raphael2020-03-25T16:16:11+00:00The Problem: Facilities management at the head office of one of the UK’s leading retailers wanted to improve HVAC energy efficiency and increase cooling [...]
Golf Club Links with Gibbons for Irrigation System Improvement
Raphael2019-10-14T09:28:47+01:00The Problem: A prestigious Essex golf club needed to upgrade their irrigation pump set system during the joint-hottest summer on [...]
Rapid Response from Gibbons Prevents Critical Pumping Station from Running Dry
Raphael2019-08-14T11:11:45+01:00When flood damage at a pumping station threatened to cut the water supply to 25,000 homes, a rapid response helped Essex & Suffolk Water [...]
Essex Farmer Reaps the Benefits of Using Single Electrical Contractor for Grain Store
Raphael2019-02-11T14:03:56+00:00Henry Siggers farms 450 hectares of group 1 milling wheat at Leapingwells Farm in Kelvedon, Essex – the fourth generation of his family to [...]
Service and Maintenance of Road and Rail Tunnel Fans
Raphael2019-09-12T15:05:08+01:00The fan equipment within tunnels is arguably one of the most important items of plant. Typically this equipment is installed to save lives in [...]
Air Purging System at Bairds Malt
Raphael2019-03-25T16:48:38+00:00Bairds Malt is one of the UK’s leading producers of malt, shipping globally to all sectors of the brewing and distilling industries. Gibbons have [...]
Thermal Wheel Building
Raphael2020-02-20T16:03:43+00:00A thermal wheel (also known as a rotary heat exchanger, rotary air-to-air enthalpy wheel or heat recovery wheel) is a type of energy-recovery heat [...]
Sludge Optimisation for Anglian Water
Raphael2020-02-20T16:12:53+00:00Anglian Water's Colchester Sewage Treatment Works called upon Gibbons when two sludge pump upgrades also called for two new variable speed drives. The pumps [...]
Chemical Optimisation
Raphael2020-02-20T16:41:01+00:00When Essex & Sussex Ormesby Water Treatment Works needed an upgraded Orthophosphoric Acid Dosing Pump Drive, Gibbons were on hand to deliver the project. [...]
Colchester Zoo Pump Overhaul
Raphael2019-03-19T13:46:12+00:00Colchester Zoo is one of the finest zoos in Europe thanks to a continuing programme of development, which has seen it win the coveted [...]
Honey Line Improvements for Famous Jam Producer
Raphael2019-03-19T13:50:39+00:00When the clear honey line at Tiptree-based Wilkin & Sons was to be modified to incorporate a set honey production, the [...]
Indoor Skydiving Fan Refurbishment
Raphael2019-03-19T13:54:23+00:00Airkix in Milton Keynes (now known as iFLY) was the first European indoor skydiving tunnel of its kind upon opening in 2005. Air is [...]
Gibbons Ultraviolet Solutions Rectify College Odour Issue
Raphael2019-01-28T15:50:39+00:00When a national building contractor working on a new £25 million college development identified an unpleasant problem with a recently-constructed property, they called in [...]
Apple-Milling Process Refurbished
Raphael2019-03-19T14:03:11+00:00When a Suffolk brewery – one of Britain’s oldest family-run businesses – required three essential elements of its apple-milling process to be refurbished, they [...]
Control System Project for UK Malt Producer
Raphael2019-01-28T15:51:19+00:00In March 2016, leading UK malt producer Bairds Malt asked Gibbons Engineering Group to modernise an agitator system at its Witham plant. The project [...]
Emergency Drive Hire for Anglian Water
Raphael2019-01-28T15:53:00+00:00A quick response from ABB authorised value provider Gibbons Engineering Group allowed Anglian Water to avoid the risk of a sewage leak and resume operations [...]
Gibbons Replace a Motor Gearbox for Leading UK Malt Producer
Raphael2019-03-18T08:26:44+00:00Gibbons were commissioned to replace a motor gear box for Bairds Malt - a leading UK name in malt production. Having served the brewing [...]
Malt Producer Raises Glass to Improved Productivity with ABB drive
Raphael2019-01-28T15:55:08+00:00A production facility that turns barley into malt for use in beer and whisky production has increased productivity and safety by installing a new germination [...]
Variable-Speed Drive Installation
Raphael2019-03-19T14:08:42+00:00Gibbons Engineering Group has undertaken thousands of successful variable-speed drive (VSD) installations over many years, witnessing the full potential of drive technology being realised. [...]
DC to AC Motor Upgrade for International Manufacturer
Raphael2019-02-05T10:19:13+00:00When an international manufacturer of cabling and connectors for broadband, telecoms and satellite solutions wanted to upgrade a cable extrusion machine from DC to AC [...]
Gibbons Improves Hygiene and Efficiency at Famous Jam Factory
Raphael2019-02-05T10:27:12+00:00Wilkin & Sons of Tiptree has been making jam, marmalade and other preserves for more than 130 years, producing much of its own fruit [...]
Full Electrical Installation for New-Build Grain Store
Raphael2019-02-05T10:42:29+00:00Full electrical installation for new-build grain store, including bespoke grain-dryer fan system, mains power, wiring, control panel, sockets and high-bay lighting. [...]
Bairds Malt Kiln Fan Drive Replacement
Raphael2019-03-19T14:32:57+00:00When leading UK malt producer Bairds Malt chose to upgrade the drive system in a crucial element of their operation, they turned to Gibbons [...]
24-Hour Drive Hire Minimises Disruption for Water Authority
Raphael2019-03-19T14:36:51+00:00A quick response from ABB authorised value provider Gibbons Engineering Group allowed a local water authority to quickly resume operations and avoid service interruption [...]